KIVO CR SL

SPECIFICATIONS

Application Ground mounted
Grounding single pile ramming or drilling and concrete filling
Soil Classed DIN 18300 Soil Classes 3-5
Soil Classes 5-7(drilling)
Material Cold roll-formed pre galvanized steel
profiles according to EN 10147 – S320 + Z,
or post galvanized steel profiles,
Hot dip Galvanized piles IPE, RHS, Sigma or C
section piles according to EN ISO 1461:2009
Tilt Angles Upon demand from 10 to 40 degrees
Panel Arrangement 3-4 rows horizontal mounting(landscape)
1-2 rows vertical mounting(portrait)
Module Compatibility Framed modules,
all available commercial types
Average Installation Rate Up to 18,6 kWp/man per day
Accessories Aluminum middle and end clamps: EN AW-6063 T66
Connection Type Grade 8.8 (galvanized)
M12 and M8 (clamps) according to DIN933, 125, 9021, 985,
912 EPDM rubber against Electrolytic corrosion
Warranty 20 years
Manufacturing Location Depending on location of installation site

NORM & STANDARDS

Eurocode 1:

Actions on structures (EC1, ENV 1991 1-1, 1–3, 1-4),

  • Part 1-1: General actions – Densities, self-weight and imposed loads – Part 1-3: General actions – Snow loads
  • Part 1-4: General actions – Wind actions

Eurocode 3:

Design of steel structures (EC3, ENV 1991-1-1, 1-3)

  • Part 1-1: General rules and rules for buildings
  • Part 1-3: General – Cold formed thin gauge members and sheeting
  • Part 1-8: General – Design of joints
  • Part 1-10: General – Material toughness and through thickness assessment

Eurocode 8:

Design of structures for earthquake resistance (EC8, ENV 1998-1-1) -Part 5: Foundations, retaining structures and geotechnical aspects -Part 1: General rules, seismic actions and rules for buildings -National Norms for Earthquake Resistance
Other Regional Standards where Eurocodes not applicable.

Category: